1,500Tons a month across our plants

2-4Weeks from approved drawings to site

11States we deliver and erect in

Metal Roof Deck, shipped with the steel it sits on.

Modular Steel Structures fabricates metal roof deck in our own plants in Mexico and details it in Tekla with the structural steel and joists it sits on. We deliver it to US job sites in 11 states as one package, with one all-inclusive price per project.

Get My Project Quote
Line drawing of a row of steel joists with corrugated metal roof deck sheets laid across them one by one, each fastened where it landsRD-01STEEL JOISTS · CORRUGATED METAL DECK · FASTENED · NUMBERED
Scroll Joists · Deck · Fastened · Numbered

Made in our own plants. Arrives with its steel.

Cross-section of a fluted metal roof deck profile on a technical grid, with a dimension line reading profile and gauge per designJOIST TOP CHORDPROFILE AND GAUGE PER DESIGNMETAL ROOF DECK · SECTIONRIB
Deck profile and gauge set by the design of your project
Steel roof deck

Our steel roof deck is fabricated in our own plants in Mexico and detailed in Tekla with the structural steel and joists it sits on. Every piece is numbered in erection sequence and ships with that steel, with erection drawings. Insulation and roofing go on top, by others.

Get My Project Quote
  • 1,500Tons a month across our plants
  • In-houseFabricated in our own plants
  • 3 in 1Shipped with the structural steel and joists
  • 1All-inclusive price per project

What's included with our metal roof deck.

Steel deck, the joists it sits on and the engineering that ties them together, in one all-inclusive price per project.

01

Engineering and detailing in Tekla

The deck is detailed in Tekla with the structural steel and joists it sits on.

Details

We work from your drawings, a model or just your project details. The roof deck, the structural steel and the joists are detailed together in Tekla, and every piece is numbered in erection sequence.

02

Metal roof deck

Corrugated metal deck fabricated in our own plants in Mexico.

Details

Corrugated steel sheets fastened across the joists or beams form the base of the roof. The profile and gauge are set by the design of your project, and every piece is numbered in erection sequence.

03

Steel joists and joist girders

The joists the deck sits on, from our dedicated joist plant.

Details

Steel joists and joist girders are fabricated at our joist plant in Ciudad Juarez, Mexico, and ship with the roof deck and the structural steel as one package.

04

Delivery and optional erection

Freight and border crossing included. Erection available in 11 states.

Details

The roof deck ships with the structural steel and joists, 2 to 4 weeks from approved drawings. We erect it in 11 states, or your crew sets it in place with basic crews and cranes.

How it worksModular Steel

From your drawings to a decked roof in four steps.

Planning a corrugated metal deck roof? This is exactly how a roof deck project moves from your drawings to your job site with us.

  1. 01

    Send drawings or project details

    Drawings, a model or just your project details. We quote one all-inclusive price.

  2. 02

    Engineering, detailing and erection sequence

    We detail the roof deck in Tekla with the structural steel and joists it sits on and send the drawings for your approval.

  3. 03

    Fabrication and numbering

    The deck is fabricated in our own plants in Mexico and every piece is numbered in erection sequence.

  4. 04

    Delivery, then erection or bolt-up

    The deck ships with the steel and joists 2 to 4 weeks from approved drawings. We erect it, or your crew sets it in place.

Plant to job site · freight included Line drawing of a flatbed truck carrying numbered steel beams from the plant to the job sitePLANT · MEXICOBORDER CROSSING INCLUDEDJOB SITE · US010203040506
Step by step: we erect or your crew bolts it together
The four steps of a metal roof deck project, with our erection or bolt-up by your crew
StepWhat happensWe erectYour crew bolts it together
1. Send drawings or project detailsYou share drawings, a model or your project details. We return one all-inclusive price.Erection included in the priceEngineering, fabrication, freight and border crossing in the price
2. Engineering, detailing and erection sequenceWe detail the roof deck in Tekla with the structural steel and joists and set the erection sequence. You approve the drawings.Modular Steel Structures, with your approvalModular Steel Structures, with your approval
3. Fabrication and numberingThe deck is fabricated in our own plants in Mexico and every piece is numbered in erection sequence.Modular Steel StructuresModular Steel Structures
4. Delivery, then erection or bolt-upThe deck, the steel and the joists reach your site with erection drawings 2 to 4 weeks from approved drawings, freight and border crossing included.We erect it, in 11 statesYour crew sets it in place with basic crews and cranes

Roof deck we've delivered.

A selection of projects with metal roof deck, described by building type and steel scope.

01 / 04

Two distribution buildings

El Paso, Texas

Steel scope: structural steel, steel joists and metal roof deck for two distribution buildings.

Scope
  • Structural steel
  • Steel joists
  • Metal roof deck

Roof deck questions.

Have a project in Texas or the Southeast?

What is metal roof deck?

Metal roof deck is corrugated steel sheets fastened across the joists or beams to form the base of the roof. Insulation and roofing go on top, by others. We fabricate it and ship it with the structural steel and joists.

Are you steel deck manufacturers?

Yes. We fabricate metal roof deck and composite floor deck in our own plants in Mexico and supply them to US projects.

What is the difference between roof deck and composite floor deck?

Roof deck forms the base of the roof. Composite floor deck works with a concrete slab poured on top to form floors. We fabricate both.

Which metal roof deck profiles do you supply?

The profile and gauge are set by the design of your project. We detail the deck in Tekla with the rest of the steel.

Can I order roof deck without the full structure?

Yes, when the volume fills whole trucks. Roof deck also ships with the structural steel and joists as one package.

How fast can you deliver?

2 to 4 weeks from approved drawings to your site.

Do you build to US codes?

Yes. We comply with US codes and standards.

Service area

Texas and the Southeast, delivered bolt-ready.

We deliver metal roof deck, and erect it, in Texas, Oklahoma, Arkansas, Louisiana, Mississippi, Alabama, Tennessee, Georgia, Florida, North Carolina and South Carolina.

Map of the southern and eastern United States with the 11 service states highlightedAlabamaFloridaGeorgiaNorth CarolinaOklahomaTexasArkansasMississippiTennesseeSouth CarolinaLouisiana
Delivery and erection available

Get your project quote

One all-inclusive price per project. Send drawings, a model or just your project details.

PDF, DWG, IFC or ZIP