1,500Tons a month across our plants

2-4Weeks from approved drawings to site

11States we deliver and erect in

Composite Metal Deck, ready for the slab.

Modular Steel Structures fabricates composite metal deck in our own plants in Mexico for multi-story buildings, mezzanines and parking structures. We detail it in Tekla with the structural steel and deliver it to US job sites in 11 states. The concrete slab is poured on site by others.

Get My Project Quote
Line drawing of steel floor beams with composite metal deck sheets laid across them one by one, then the outline of the concrete slab by othersCONCRETE SLAB BY OTHERSFD-01FLOOR BEAMS · COMPOSITE METAL DECK · SLAB BY OTHERS · NUMBERED
Scroll Beams · Deck · Slab by others · Numbered

Floors start in our plant. The slab follows on site.

Cross-section of a composite metal deck with embossed ribs and the dashed outline of the concrete slab above it, with a dimension line reading profile, gauge and slab per designCONCRETE SLAB BY OTHERSSTEEL BEAMPROFILE, GAUGE AND SLAB PER DESIGNCOMPOSITE METAL DECK · SECTION
Deck profile, gauge and slab set by the design of your project
Composite steel deck

Our composite steel deck is fabricated in our own plants in Mexico and detailed in Tekla with the structural steel it spans. Every piece is numbered in erection sequence and ships with the steel and erection drawings. Your general contractor pours the concrete slab on top.

Get My Project Quote
  • In-houseFabricated in our own plants
  • TeklaDetailed in Tekla with the structural steel
  • 2 in 1Shipped with the structural steel
  • 1All-inclusive price per project

What's included with our composite floor deck.

The deck, the steel it spans and the engineering that ties them together, in one all-inclusive price per project. The concrete slab stays with your general contractor.

01

Engineering and detailing in Tekla

The deck is detailed in Tekla with the structural steel it spans.

Details

We work from your drawings, a model or just your project details. The composite floor deck and the structural steel are detailed together in Tekla, and every piece is numbered in erection sequence.

02

Composite floor deck

Composite metal floor deck fabricated in our own plants in Mexico.

Details

Steel deck that works together with the concrete slab poured on top of it to form a floor, for multi-story buildings, mezzanines and parking structures. The profile and gauge are set by the design of your project.

03

Structural steel fabrication

The beams and girders the deck spans, CNC fabricated in our own plants.

Details

The structural steel frame is engineered in Tekla, CNC fabricated in our plants in Mexico and numbered in erection sequence, then ships with the floor deck.

04

Delivery and optional erection

Freight and border crossing included. Erection available in 11 states.

Details

Floor deck ships with the structural steel, 2 to 4 weeks from approved drawings. We erect it in 11 states, or your crew sets it in place with basic crews and cranes. The concrete slab is poured by your general contractor.

How it worksModular Steel

From your drawings to deck ready for the slab in four steps.

Planning metal floor deck for a multi-story building, mezzanine or parking structure? This is exactly how a floor deck project moves from your drawings to your job site with us.

  1. 01

    Send drawings or project details

    Drawings, a model or just your project details. We quote one all-inclusive price.

  2. 02

    Engineering, detailing and erection sequence

    We detail the floor deck in Tekla with the structural steel it spans and send the drawings for your approval.

  3. 03

    Fabrication and numbering

    The deck is fabricated in our own plants in Mexico and every piece is numbered in erection sequence.

  4. 04

    Delivery, then erection or bolt-up

    The deck ships with the steel 2 to 4 weeks from approved drawings. We erect it, or your crew sets it in place. The slab is poured by others.

Plant to job site · freight included Line drawing of a flatbed truck carrying numbered steel beams from the plant to the job sitePLANT · MEXICOBORDER CROSSING INCLUDEDJOB SITE · US010203040506
Step by step: we erect or your crew bolts it together
The four steps of a composite floor deck project, with our erection or bolt-up by your crew
StepWhat happensWe erectYour crew bolts it together
1. Send drawings or project detailsYou share drawings, a model or your project details. We return one all-inclusive price.Erection included in the priceEngineering, fabrication, freight and border crossing in the price
2. Engineering, detailing and erection sequenceWe detail the floor deck in Tekla with the structural steel and set the erection sequence. You approve the drawings.Modular Steel Structures, with your approvalModular Steel Structures, with your approval
3. Fabrication and numberingThe deck is fabricated in our own plants in Mexico and every piece is numbered in erection sequence.Modular Steel StructuresModular Steel Structures
4. Delivery, then erection or bolt-upThe deck and the steel reach your site with erection drawings 2 to 4 weeks from approved drawings, freight and border crossing included. Your general contractor pours the slab.We erect it, in 11 statesYour crew sets it in place with basic crews and cranes

Floor deck we've delivered.

A selection of projects with composite floor deck, described by building type and steel scope.

01 / 04

Automotive components plant

Montgomery, Alabama

Steel scope: structural steel, steel joists, metal roof deck and composite floor deck for a plant that manufactures automotive components.

Scope
  • Structural steel
  • Steel joists
  • Metal roof deck
  • Composite floor deck

Composite deck questions.

Have a project in Texas or the Southeast?

What is composite metal deck?

Composite metal deck is steel deck that works together with the concrete slab poured on top of it to form a floor. It is used in multi-story buildings, mezzanines and parking structures.

Do you manufacture composite steel deck?

Yes. We fabricate composite floor deck and metal roof deck in our own plants in Mexico and supply them to US projects.

What is the difference between composite floor deck and roof deck?

Composite floor deck carries a concrete slab to form floors. Roof deck forms the base of the roof.

Do you pour the concrete?

No. We supply and erect the steel deck. The concrete slab is poured by your general contractor.

Which profiles do you supply?

The profile and gauge are set by the design of your project. We detail them in Tekla.

How fast can you deliver?

2 to 4 weeks from approved drawings to your site.

Do you build to US codes?

Yes. We comply with US codes and standards.

Service area

Texas and the Southeast, delivered bolt-ready.

We deliver composite floor deck, and erect it, in Texas, Oklahoma, Arkansas, Louisiana, Mississippi, Alabama, Tennessee, Georgia, Florida, North Carolina and South Carolina.

Map of the southern and eastern United States with the 11 service states highlightedAlabamaFloridaGeorgiaNorth CarolinaOklahomaTexasArkansasMississippiTennesseeSouth CarolinaLouisiana
Delivery and erection available

Get your project quote

One all-inclusive price per project. Send drawings, a model or just your project details.

PDF, DWG, IFC or ZIP